Lomita, CA
A new roof in Lomita, priced honestly
Replacing a roof is four days of noise and one decision that lasts thirty years. It is worth an afternoon of comparing.
Describe the replacement job
Three questions, then the address. Up to three Lomita contractors who do this work.
You are on the list.
No provider in Lomita is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before you let anybody on the roof
The things worth pinning down on a replacement job. A contractor who has not raised them has not looked properly.
- How the site is protected, and who cleans up the nails
- Ventilation: what is there now, what it should be
- Which underlayment, and whether ice-and-water goes on the eaves and valleys
- Tear-off or overlay, and what the local code allows
- Who pulls the permit, and what the inspection schedule looks like
Two quotes at the same price can be very different roofs. Compare the layers, not the brand name on the shingle.
Insist on knowing what happens to decking that turns out to be rotten. The good answer is a per-sheet price agreed in writing before the job starts.
Warranties come in two halves that get deliberately confused. The manufacturer covers the material, and only if it was installed to specification. The contractor covers the workmanship, and only for as long as they stay in business.
Locally
Then, less dramatically: dry offshore wind that arrives all at once in autumn. Dry offshore wind lifts material that damp coastal air had been holding down. Most wind losses here happen on a handful of nights a year.
About replacement here
How quickly will someone call?
Most requests are picked up the same day, often within an hour. Emergencies are prioritised. If you have not heard anything by the next morning, check voicemail — contractors usually call from a mobile.
Why does ventilation keep coming up?
It is the most under-sold part of a roof. Trapped heat and moisture shorten shingle life, warp decking, and in cold weather it is what turns snow into an ice dam.
It is leaking right now. What do I do?
Move what you can out of the way, put a bucket under it, and if there is a bulge in the ceiling put a small hole at its lowest point to let the water out in one place rather than bringing the whole panel down. Then mark your request as an emergency — those go out first.
What if the decking is rotten underneath?
Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.
Get it priced
Free, no obligation, and your details go to no company until you say yes.
